« Return to the blog entry
Another way of doing things ...
1) Upon saving an Event, use a wqs agent to set the isNextWeeksEvent field to be 0 or 1.
2) Have the MeetingsNextWeek view's selection criteria of being isNextWeeksEvent = 1
3) Run a scheduled (daily) agent to reset the isNextWeeksEvent field value if it needs to be changed.
Another way of doing things ...
1) Upon saving an Event, use a wqs agent to set the isNextWeeksEvent field to be 0 or 1.
2) Have the MeetingsNextWeek view's selection criteria of being isNextWeeksEvent = 1
3) Run a scheduled (daily) agent to reset the isNextWeeksEvent field value if it needs to be changed.